Cases
Metro industry
Airport industry
Municipal engineering
Commercial Projects
Electronic factory
Products
(Humidity/Temperature) sensors / transmitters
Pressure Sensors & Transmitter
Air & Gas Detectors
Electrical Transducers
Other series
Support
Service
Download
FAQ
Home > Caese

Cases

  • Second phase of pudong international airport terminal
    Second phase of Shanghai pudong international airport terminal (T2) on the east side of the issue of terminal area, in the middle of the airport rail transit station symmetrical layout, form and issue of similar terminal, a total construction area of nearly 500000 square meters, consists of the main
  • Shenzhen metro line 3
    Deep longgang line early ssangyong station subway line 3 engineering curriculum construction scope of grass from luohu district Po station, stop at longgang district ssangyong station, a horizontal bar car depot, such as one and a half underground station 1, elevated station 15, the main two substat
  • Macro depending on the project
    A collection of high and new technology software and hardware development, production, engineering and technical services in one company, the company since its inception has been committed to digital video, computer network, the smart, intelligent building elv systems engineering and system integrat
  • Seven, Shanghai metro line no. 9
    Northwest of Shanghai rail transit line 7 from downtown queshan road station (queshan road Chen Tailu) survey road station to pudong fang city, through the center line length is about 34.388 km. A total of 28 stations (including 11 bifurcation station), all for the underground station. A period in 3
The3Page,Total 24 Records 3 Page First Previous Next Last The Page
Contact Us | statement | Job | Power by: xingbell Copyright © 2013 GC Automation CO.,LTD.