Design unit: British RMJM company, Beijing architectural design institute
Starting time: on April 28, 2005
Completion time: during the construction period of the Olympic Games is between April 2005 and July 2005, a total of 862 days; After the renovation to meet the requirements of meeting center operations, time limit for a project for the October 2008 to June 2009, a total of 240 days.
Total cost: 891 million yuan
Location: the city is located in the north of the national conference center is located in the Beijing Olympics park central area, adjacent to the bird's nest, water cube and national indoor stadium. Here is also the core of the business circle, 25 kilometers from the capital airport, about 30 minutes drive, traffic is very convenient. By the national conference center to tiananmen square, the Summer Palace, the Great Wall, the Ming tombs sightseeing or along business district, Beijing, zhongguancun is also very quick. Connected to the city center, railway station and airport metro line 8 and the metro line 15 is under construction at the national conference center is equipped with the station, more than more bus lines through the national convention center.
Address: Beijing chaoyang district tianchen east road no. 7
© 2013 Baidu - Data © NavInfo & CenNavi & behing
The national center for the meeting
Construction area: national conference center with a total land area of about 12.22 hectares, with a total construction area of about 530000 square meters. The subjects of the conference center construction area of 270000 square meters, building 43 meters high, 398 meters long, 148 meters wide, a total of 8 layer, is the Olympic monomer building area is the largest building construction projects.
Supporting facilities: supporting facilities: the gross area is approximately 260000 square meters, including 2 hotel, 2 office building and commercial building.
Usage: during the 2008 Olympic Games, the national conference center four layers of 6400 square meters of fencing preliminaries, the function and the modern pentathlon fencing, the semi and final project shooting game is located. A layer of 24000 square meters of exhibition hall and underground space as the Olympic and paralympic games international broadcast center (IBC) and the main press center (MPC) use [2].
During the paralympics, a layer of 4800 square meters grand ballroom held a wheelchair fencing and boccia game. Form a complete set of hotel officially registered media reporters used for the Olympic Games. After internal reform after the Olympic Games, the national conference center on November 1, 2009 grand opening, become China's largest and newest, the geographical position is superior, peripheral complete oversize conference center, the national conference center is a world-class level, can satisfy the large conference, exhibition, various public activities and hotel rooms need large public facilities.