Sociedade DE jogos DE macau on all the way across the former workers stadium location to build a new hotel, and named it the new grand lisboa hotel, new and old lisboa hotel to pedestrian tunnel connection. The whole project investment of more than 3 billion patacas, site area of about twelve thousand square meters, construction area of about one hundred and thirty-five thousand square meters. 44 years 2008 2008 m floor layer architect DLN Architects & Engineers use hotel/casino. After the completion of SJM's flagship casino. The project is divided into three phases.
The whole project cost 4.4 billion patacas, construction area of about 135000 square meters. After the completion will be SJM's flagship casino. The project is divided into three phases:
1 egg shape diamond podium building, faces the lisboa hotel, covers an area of 38000 square meters, 1 / f, shop, ground, if the original poster casino 2-4 and 6 restaurant, shop also includes a parking lot, and the lisboa hotel with pedestrian Bridges and tunnel connection, February 11, 2007, in the opening, the casino temporarily set 240 tables and 240 slot machines;
2 the lotus flower shaped part of the hotel building, pt school, back to macau on broadly the narrow design, building height of 258 meters, a total of 52, 420 rooms, clubs, with restaurants, brand stores, banquet hall, hotel lobby, etc. The second highest building, shopping malls and macau for macau high buildings.